Horizontal Division Completed Projects
Expand Apron Phase I for the Prattville/Grouby Field Airport
 

$ .36 million Expand Apron Phase I for the Prattville/Grouby Field Airport. This project involves grading, drainage, base, and paving.


Alabama Department of Transportation (ALDOT) Highway 231
Wetumpka, AL –Construction includes mass site grading for constructing additional lanes and streets, installation of water and sanitary sewer lines, storm drainage pipe and associated inlet structure installation, removal and replacement of highway medians, curb and gutter, slope paving, sidewalk, construction of box culvert, construction of crushed aggregate base course, asphalt paving and resurfacing of existing and newly constructed streets and travel lanes.

Alabama Department of Transportation (ALDOT) Atlanta Highway at Oliver Creek
Montgomery, AL – Construction of project will include installation of 30-inch water and sanitary sewer mains and their associated manholes and appurtenances, installation of water and sanitary sewer lines under existing highway by method of encasing and boring, installation of 30-inch water main across live Oliver Creek, installation of 30-inch tapping valves and sleeves, sanitary sewer installation will include bypassing and pumping active 30-inch sewer lines, temporary rip-rap installation.

The Coffee Exchange at Homeplace Featuring Kohl's
Prattville, AL – Construction will include mass site grading associated with construction of building pads, parking lots and entrance road; construction includes mass grading, installation of underground piping i.e., domestic water and sanitary sewer and storm drain pipe as large as 84-inches in diameter, storm drain inlet structures, conduits for electricity, curb and gutter, sidewalk, asphalt parking lots, irrigation and erosion control.

The Coffee Exchange at Homeplace Featuring Academy Sporting Goods and Hobby Lobby
Prattville, AL – Construction will include mass site grading associated with construction of building pads, parking lots and entrance road; construction includes moving over 260,000 cubic yards of dirt, installation of underground piping in excess of 22,000 LF, i.e., domestic water and sanitary sewer and storm drain pipe as large as 84-inches in diameter, storm drain inlet structures, conduits for electricity, curb and gutter, sidewalk, asphalt parking lots, irrigation, rip-rap and erosion control.

Carver High School
Montgomery, AL - Construction will include mass site grading associated with construction of football practice field; installing water lines, sanitary sewer lines, storm water pipe and inlets; conduits for electricity, parking lot lighting and cable; construction of curb and gutter, sidewalk, concrete flumes, crushed aggregate base course, asphalt parking lots; chain link fence.

Carr Middle School
Montgomery, AL - Construction will include mass site grading associated with construction of building pad; installing water lines, sanitary sewer lines, storm water pipe and inlets; conduits for electricity, parking lot lighting and cable; construction of curb and gutter, sidewalk, concrete flumes, line stabilized subgrade, asphalt parking lots.

Wetumpka Recreation Facility
Wetumpka, AL - Construction will include mass site grading associated with construction of five (5) girls little league softball fields; installing water lines, sanitary sewer lines, storm water pipe and inlets; conduits for electricity, telephone, parking lot lighting and cable; construction of curb and gutter, sidewalk, concrete flumes, crushed aggregate base course, asphalt parking lots; electrical, light poles, score boards, chain link fence, backstops, dugouts, bleachers, irrigation, specialty infield material

River Bank and Trust
Montgomery, AL - Underground Storm Retention System.

Eastchase Market Center
Montgomery, AL - Construction included mass site grading; installing water lines, sanitary sewer lines, storm water pipe, storm inlets; conduits for electricity, telephone, and cable; construction of retaining walls, curb and gutter, sidewalk, concrete flumes and asphalt parking lots and entrance drives/turn lanes.

Costco Warehouse
Eastchase Market Center
Montgomery, AL - Construction will include mass site grading; installing water lines, sanitary sewer lines, storm water pipe and inlets; conduits for electricity, telephone, parking lot lighting and cable; construction of curb and gutter, sidewalk, concrete flumes, crushed aggregate base course, asphalt parking lots and entrance drives/turn lanes.

Addition of Lanes at Mitylene Exit/I-85
Alabama Department of Transportation (ALDOT)
Montgomery, AL -Construction will include site grading; installing storm water pipe, inlets, and rip rap; construction of crushed aggregate base course.

Jim ‘N Nicks Restaurant
Prattville, AL- Construction will include mass site grading; installing water lines, sanitary sewer lines, storm water pipe and conduits for electricity, telephone, and lighting; construction of curb and gutter, sidewalk, concrete flumes
and asphalt parking lot.

Airport Road Intermediate School
Elmore County Board of Education
Elmore County - Construction will include mass site grading; installing water lines, sewer lines, storm water and conduits for electricity, telephone, and cable; construction of curb and gutter, asphalt streets and parking lots.

Gateway Park Phase II Site work
Montgomery, AL - Construction will include extending Bowman Street; constructing a round-about and gravel access drive; installing water lines, sewer lines, storm water and conduits for electricity, telephone, and cable; construction of a parking lot and site will be graded for ball fields and multi-purpose fields.

©2012 Sourtheast Cherokee Construction, Inc. All rights reserved.

Website Designed and Hosted by eSolution Architects